3D physical model of steam injection in high water-cut reservoir
Liang Jinzhong
Abstract
Liang Jinzhong
Abstract
For the possible existence of water-body and high-permeability channels at the mature water-flooded reservoir of Fuyu Oilfield in Jilin Province,3D high-pressure scale model was utilized to simulate steam flooding of reservoir after water flooding.The experimental results indicated that the high-permeability channels for water flowing existed at the lower part of the water-flooded positive rhythm reservoir for the reason of high water saturation.During steam flooding,steam firstly swept the lower formation from these channels and then swept the upper formation with the increase of the cumulative steam injection.Finally an even conformance of steam in the vertical formation could be realized.The steam injection after water flooding can not only effectively enhance oil recovery factor,but also effectively reduce the water cut.Meanwhile,steam-flooding experiments on different well patterns in order to study the feasibility of steam flooding in horizontal well of thin reservoirs indicated that the production performance of steam flooding in the horizontal injector was better than that in the vertical injectors,but there were some problems such as uneven steam imbibitions in the horizontal section.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
For the possible existence of water-body and high-permeability channels at the mature water-flooded reservoir of Fuyu Oilfield in Jilin Province,3D high-pressure scale model was utilized to simulate steam flooding of reservoir after water flooding.The experimental results indicated that the high-permeability channels for water flowing existed at the lower part of the water-flooded positive rhythm reservoir for the reason of high water saturation.During steam flooding,steam firstly swept the lower formation from these channels and then swept the upper formation with the increase of the cumulative steam injection.Finally an even conformance of steam in the vertical formation could be realized.The steam injection after water flooding can not only effectively enhance oil recovery factor,but also effectively reduce the water cut.Meanwhile,steam-flooding experiments on different well patterns in order to study the feasibility of steam flooding in horizontal well of thin reservoirs indicated that the production performance of steam flooding in the horizontal injector was better than that in the vertical injectors,but there were some problems such as uneven steam imbibitions in the horizontal section.
Key concepts: Steam injection, Petroleum engineering, Injector, Water flooding, Flooding (psychology), Permeability (electromagnetism), Geology, Water injection (oil production)