Discussion on Integrated Commissioning and Test of Overhead Contact System of High Speed Railway
Yang Jin-ran
Abstract
Yang Jin-ran
Abstract
The overall test, evaluation and verification of overhead contact system functions of the whole line have been performed by the inspection car and other testing equipment under the specified testing speed, and commissioning and optimization made for overhead contact system reach the design requirements, providing scientific philosophy for putting into operation of high speed railways.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The overall test, evaluation and verification of overhead contact system functions of the whole line have been performed by the inspection car and other testing equipment under the specified testing speed, and commissioning and optimization made for overhead contact system reach the design requirements, providing scientific philosophy for putting into operation of high speed railways.
Key concepts: Overhead (engineering), Project commissioning, Contact system, Engineering, Overhead line, Test (biology), Reliability engineering, Line (geometry)