2012CoalRequires access

Application of Roof Pre-fracturing Blasting Technology during Initial Mining in Fully-Mechanized Face

Huang Ting

Open publisher page 1 citations

Abstract

With regards to problem that hard roof is not easy breaking down and top coal recovery during initial mining on fully-mechanized face in Changchun Coal Mine's,it adopted pre-cracking blasting technique on S6-2 fully-mechanized face,and it analyzed and summarized pre-cracking efficiency.The results indicate that first weighting pace of main roof reduced from 37.8 m to 13 m after roof pre-cracking,pressure strength was not markedly changed,however,continuous cycle was evidently reduced;the technique simultaneously solved the roof coal recycling well.In this experiment,more than 9 399 t coal was recovered because of 15 m early caving.

About this research paper

What this paper is about

With regards to problem that hard roof is not easy breaking down and top coal recovery during initial mining on fully-mechanized face in Changchun Coal Mine's,it adopted pre-cracking blasting technique on S6-2 fully-mechanized face,and it analyzed and summarized pre-cracking efficiency.The results indicate that first weighting pace of main roof reduced from 37.8 m to 13 m after roof pre-cracking,pressure strength was not markedly changed,however,continuous cycle was evidently reduced;the technique simultaneously solved the roof coal recycling well.In this experiment,more than 9 399 t coal was recovered because of 15 m early caving.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With regards to problem that hard roof is not easy breaking down and top coal recovery during initial mining on fully-mechanized face in Changchun Coal Mine's,it adopted pre-cracking blasting technique on S6-2 fully-mechanized face,and it analyzed and summarized pre-cracking efficiency.The results indicate that first weighting pace of main roof reduced from 37.8 m to 13 m after roof pre-cracking,pressure strength was not markedly changed,however,continuous cycle was evidently reduced;the technique simultaneously solved the roof coal recycling well.In this experiment,more than 9 399 t coal was recovered because of 15 m early caving.

Key concepts: Roof, Cracking, Rock blasting, Coal, Mining engineering, Coal mining, Geotechnical engineering, Engineering