The Construction Technology Research of the Pushing for the New Road Pass Freeway

Wu We

Open publisher page 0 citations

Abstract

Based on the intersection works between Xindong Road of an industrial park and Beijing-HongkongMacao Highway,according to the engineering characteristics of the project,appropriate organization and corresponding construction implementation schedule were made. Through the project,the calculation approaches in theory was applied in the practical project. The box culver's maximum jacking pressure was calculated to determine the number of oil jack so as to better guide the production and construction process of the project,culvert installation,and monitoring and control in jacking construction process,the control good construction process of deformation and culvert posture,to ensure the safety of the construction process,and the design and construction of paper pushing similar culvert provide some guidance for the future.

About this research paper

What this paper is about

Based on the intersection works between Xindong Road of an industrial park and Beijing-HongkongMacao Highway,according to the engineering characteristics of the project,appropriate organization and corresponding construction implementation schedule were made. Through the project,the calculation approaches in theory was applied in the practical project. The box culver's maximum jacking pressure was calculated to determine the number of oil jack so as to better guide the production and construction process of the project,culvert installation,and monitoring and control in jacking construction process,the control good construction process of deformation and culvert posture,to ensure the safety of the construction process,and the design and construction of paper pushing similar culvert provide some guidance for the future.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the intersection works between Xindong Road of an industrial park and Beijing-HongkongMacao Highway,according to the engineering characteristics of the project,appropriate organization and corresponding construction implementation schedule were made. Through the project,the calculation approaches in theory was applied in the practical project. The box culver's maximum jacking pressure was calculated to determine the number of oil jack so as to better guide the production and construction process of the project,culvert installation,and monitoring and control in jacking construction process,the control good construction process of deformation and culvert posture,to ensure the safety of the construction process,and the design and construction of paper pushing similar culvert provide some guidance for the future.

Key concepts: Culvert, Jacking, Engineering, Schedule, Civil engineering, Process (computing), Construction engineering, Intersection (aeronautics)