Design of Ezhou-Huanggang Changjiang River Highway Bridge
Wei Fang
Abstract
Wei Fang
Abstract
Ezhou Huanggang Changjiang River Highway Bridge is an extra large bridge by which No.106 national trunk highway crosses Changjiang river. The main span of 480 m prestressed reinforced concrete cable\|stayed bridge is adopted. The design conditions, general arrangement, construction design and technical characteristics of the main bridge, the main construction technology and the scientific tests of the bridge are specially introduced in this paper.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Ezhou Huanggang Changjiang River Highway Bridge is an extra large bridge by which No.106 national trunk highway crosses Changjiang river. The main span of 480 m prestressed reinforced concrete cable\|stayed bridge is adopted. The design conditions, general arrangement, construction design and technical characteristics of the main bridge, the main construction technology and the scientific tests of the bridge are specially introduced in this paper.
Key concepts: Bridge (graph theory), Engineering, Span (engineering), Civil engineering, Prestressed concrete, Geotechnical engineering, Environmental science, Internal medicine