Integrating Operation Study of Soil Stripping and Land Reclamation in Zhungeer Mine Area
Guoying Zhang
Abstract
Guoying Zhang
Abstract
Based on the fact of topsoil shortage of Haerwusu Open-pit Mine,the scheme that exploits Heidaigou's topsoil to reclamation the dump of Haerwusu Open-pit mine was proposed.In addition,the new scheme was proposed by qualitative and quantitative analysis,the results show that Heidaigou Open-pit Mine topsoil transport Haerwusu dump is feasible in technology and reasonable in economy.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the fact of topsoil shortage of Haerwusu Open-pit Mine,the scheme that exploits Heidaigou's topsoil to reclamation the dump of Haerwusu Open-pit mine was proposed.In addition,the new scheme was proposed by qualitative and quantitative analysis,the results show that Heidaigou Open-pit Mine topsoil transport Haerwusu dump is feasible in technology and reasonable in economy.
Key concepts: Land reclamation, Topsoil, Economic shortage, Open-pit mining, Mining engineering, Environmental science, Stripping (fiber), Waste management