Study on Gateway Optimization of Strip Mining Block in Guantun Mine

Duan Hong-min

Open publisher page 0 citations

Abstract

There were three seam roadways set in Guantun Mine.In order to form a system,five air bridges designed for the three mining gateways of the first coal mining face in the mine could realize the connection with the mine roadway.There were slow construction,difficult controlled quality and other problems existed in the five air bridges.The paper proposed that the level of the connection gateway of the miming gateway should be raised to realize the crossing with the mine roadway.The air returning gateway would cross over the mine roadway with the connection gateway,would be favorable to the layout of the belt conveyor for the gateway driving and could realize the optimization of the mining gateway.An optimization was conducted on the right angle connection between the mine roadway and the mining gateway.

About this research paper

What this paper is about

There were three seam roadways set in Guantun Mine.In order to form a system,five air bridges designed for the three mining gateways of the first coal mining face in the mine could realize the connection with the mine roadway.There were slow construction,difficult controlled quality and other problems existed in the five air bridges.The paper proposed that the level of the connection gateway of the miming gateway should be raised to realize the crossing with the mine roadway.The air returning gateway would cross over the mine roadway with the connection gateway,would be favorable to the layout of the belt conveyor for the gateway driving and could realize the optimization of the mining gateway.An optimization was conducted on the right angle connection between the mine roadway and the mining gateway.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

There were three seam roadways set in Guantun Mine.In order to form a system,five air bridges designed for the three mining gateways of the first coal mining face in the mine could realize the connection with the mine roadway.There were slow construction,difficult controlled quality and other problems existed in the five air bridges.The paper proposed that the level of the connection gateway of the miming gateway should be raised to realize the crossing with the mine roadway.The air returning gateway would cross over the mine roadway with the connection gateway,would be favorable to the layout of the belt conveyor for the gateway driving and could realize the optimization of the mining gateway.An optimization was conducted on the right angle connection between the mine roadway and the mining gateway.

Key concepts: Gateway (web page), Coal mining, Mining engineering, Block (permutation group theory), Connection (principal bundle), Engineering, Default gateway, Gateway address

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Gateway Optimization of Strip Mining Block in Guantun Mine — Research Paper | ScholarLens