2012China offshore PlatformRequires access

Research on Mooring Position Installation Scheme of Derrick Lay Barge

Luo Xiao-jian

Open publisher page 0 citations

Abstract

Most of the derrick pipe laying vessels are dumb barges with mooring systems. It is flexible,cost-effective,safe and reliable if the barge is outfitted with good mooring system. Therefore mooring system is important for lifting,pipe laying and survival.Research on mooring position installation scheme of derrick lay barge is introduced in this paper combing with codes and practice.

About this research paper

What this paper is about

Most of the derrick pipe laying vessels are dumb barges with mooring systems. It is flexible,cost-effective,safe and reliable if the barge is outfitted with good mooring system. Therefore mooring system is important for lifting,pipe laying and survival.Research on mooring position installation scheme of derrick lay barge is introduced in this paper combing with codes and practice.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Most of the derrick pipe laying vessels are dumb barges with mooring systems. It is flexible,cost-effective,safe and reliable if the barge is outfitted with good mooring system. Therefore mooring system is important for lifting,pipe laying and survival.Research on mooring position installation scheme of derrick lay barge is introduced in this paper combing with codes and practice.

Key concepts: BARGE, Mooring, Marine engineering, Engineering, Position (finance), Finance, Economics

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Mooring Position Installation Scheme of Derrick Lay Barge — Research Paper | ScholarLens