Development and Application of Anti-Eccentric Wear Tool in Inclined Well
Ping Wang
Abstract
Ping Wang
Abstract
Zhenjing oilfield,a low porosity and low permeability reservoir,reservoir fluid supply ability is poor and affected by the landform development,mainly in directional well.In the process of oilfield production,quite a proportion of maintenance operations on mechanical production wells are due to rod breakdown or tubing leaking resulted from borehole deviation and eccentrically worn string,it has seriously affected the normal production and greatly increased the operating and material costs.In order to effectively reduce such losses,rod centralizer buffer compensator and a magnetic support of the eccentric wear prevention tools combination has been developed and applied,the downhole friction loss is reduced greatly,the workover-free period is extended,tool designed for the performance indicators to meet the use requirements.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Zhenjing oilfield,a low porosity and low permeability reservoir,reservoir fluid supply ability is poor and affected by the landform development,mainly in directional well.In the process of oilfield production,quite a proportion of maintenance operations on mechanical production wells are due to rod breakdown or tubing leaking resulted from borehole deviation and eccentrically worn string,it has seriously affected the normal production and greatly increased the operating and material costs.In order to effectively reduce such losses,rod centralizer buffer compensator and a magnetic support of the eccentric wear prevention tools combination has been developed and applied,the downhole friction loss is reduced greatly,the workover-free period is extended,tool designed for the performance indicators to meet the use requirements.
Key concepts: Workover, Engineering, Petroleum engineering, Borehole, Porosity, Oil production, Geotechnical engineering