Study on the prearranged angle of girders in construction state for a thousand-meter scale cable-stayed bridge

Jian‐Min Zhang

Open publisher page 2 citations

Abstract

As the optimization theory and method to the calculation of cantilever construction of girders is introduced.The example bridge is a long-span cable-stayed bridge of a 1088 m central span length under construction in China.The first order optimization method is used to determine the rational construction cable forces and the prearranged angle of girders.The girder elevation errors and the bending strain energy of the girders and the cable tower is the objective function.By making the objective function least,the tension forces of cables as well as the prearranged angle of girders in construction state are obtained.Using spatial nonlinear FEM,the actual cantilever construction process of steel box-shaped girders is simulated,and the prearranged angles of girders during construction are obtained.

About this research paper

What this paper is about

As the optimization theory and method to the calculation of cantilever construction of girders is introduced.The example bridge is a long-span cable-stayed bridge of a 1088 m central span length under construction in China.The first order optimization method is used to determine the rational construction cable forces and the prearranged angle of girders.The girder elevation errors and the bending strain energy of the girders and the cable tower is the objective function.By making the objective function least,the tension forces of cables as well as the prearranged angle of girders in construction state are obtained.Using spatial nonlinear FEM,the actual cantilever construction process of steel box-shaped girders is simulated,and the prearranged angles of girders during construction are obtained.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As the optimization theory and method to the calculation of cantilever construction of girders is introduced.The example bridge is a long-span cable-stayed bridge of a 1088 m central span length under construction in China.The first order optimization method is used to determine the rational construction cable forces and the prearranged angle of girders.The girder elevation errors and the bending strain energy of the girders and the cable tower is the objective function.By making the objective function least,the tension forces of cables as well as the prearranged angle of girders in construction state are obtained.Using spatial nonlinear FEM,the actual cantilever construction process of steel box-shaped girders is simulated,and the prearranged angles of girders during construction are obtained.

Key concepts: Girder, Structural engineering, Cantilever, Engineering, Bridge (graph theory), Span (engineering), Tower, Finite element method

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on the prearranged angle of girders in construction state for a thousand-meter scale cable-stayed bridge — Research Paper | ScholarLens