Design and Implementation in Intelligent Central Control System of Coal Mine Air Compressor
Chen Kou-zhong
Abstract
Chen Kou-zhong
Abstract
Owing to new auxiliary shaft compressor room in Eighth mine of Pingdingshan Coal Mine Group backward control way.I design a monitoring and control system using in mine air compressor room.It introduces monitoring and control system of air compressor by Schneider M340 series PLC as controller.It gives overall design of control systems,hardware system and software system.At present system is running well,realizes goal of remote monitoring and automates management.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Owing to new auxiliary shaft compressor room in Eighth mine of Pingdingshan Coal Mine Group backward control way.I design a monitoring and control system using in mine air compressor room.It introduces monitoring and control system of air compressor by Schneider M340 series PLC as controller.It gives overall design of control systems,hardware system and software system.At present system is running well,realizes goal of remote monitoring and automates management.
Key concepts: Coal mining, Gas compressor, Engineering, Air compressor, Control system, Monitoring and control, Software, Controller (irrigation)