Study on scheduling scheme of flood divided into stagesforLiangjiang hydropower station
Jianjun Liu
Abstract
Jianjun Liu
Abstract
Thecatastrophic flood has occurred in 2010 and 2013 in the Erdao Songhuajiangriver. The results of the design flood have the greater increase after the flood series is extended for the Liangjianghydropower station,which produces the shortageproblem of the flood control capacity of the reservoir.The paper introduces the feasibility of flood divided into stages and the division of stage period in flood season for Liangjianghydropower station. The paper elaborates the feasibility and rationality of scheduling schemeof the stage flood for the hydropower station by analyzing the stage flood results in flood season.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Thecatastrophic flood has occurred in 2010 and 2013 in the Erdao Songhuajiangriver. The results of the design flood have the greater increase after the flood series is extended for the Liangjianghydropower station,which produces the shortageproblem of the flood control capacity of the reservoir.The paper introduces the feasibility of flood divided into stages and the division of stage period in flood season for Liangjianghydropower station. The paper elaborates the feasibility and rationality of scheduling schemeof the stage flood for the hydropower station by analyzing the stage flood results in flood season.
Key concepts: Flood myth, Hydropower, Stage (stratigraphy), Flood stage, Hydrology (agriculture), 100-year flood, Flood control, Environmental science