2015Water Resources & Hydropower of Northeast ChinaRequires access

Study on scheduling scheme of flood divided into stagesforLiangjiang hydropower station

Jianjun Liu

Open publisher page 0 citations

Abstract

Thecatastrophic flood has occurred in 2010 and 2013 in the Erdao Songhuajiangriver. The results of the design flood have the greater increase after the flood series is extended for the Liangjianghydropower station,which produces the shortageproblem of the flood control capacity of the reservoir.The paper introduces the feasibility of flood divided into stages and the division of stage period in flood season for Liangjianghydropower station. The paper elaborates the feasibility and rationality of scheduling schemeof the stage flood for the hydropower station by analyzing the stage flood results in flood season.

About this research paper

What this paper is about

Thecatastrophic flood has occurred in 2010 and 2013 in the Erdao Songhuajiangriver. The results of the design flood have the greater increase after the flood series is extended for the Liangjianghydropower station,which produces the shortageproblem of the flood control capacity of the reservoir.The paper introduces the feasibility of flood divided into stages and the division of stage period in flood season for Liangjianghydropower station. The paper elaborates the feasibility and rationality of scheduling schemeof the stage flood for the hydropower station by analyzing the stage flood results in flood season.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Thecatastrophic flood has occurred in 2010 and 2013 in the Erdao Songhuajiangriver. The results of the design flood have the greater increase after the flood series is extended for the Liangjianghydropower station,which produces the shortageproblem of the flood control capacity of the reservoir.The paper introduces the feasibility of flood divided into stages and the division of stage period in flood season for Liangjianghydropower station. The paper elaborates the feasibility and rationality of scheduling schemeof the stage flood for the hydropower station by analyzing the stage flood results in flood season.

Key concepts: Flood myth, Hydropower, Stage (stratigraphy), Flood stage, Hydrology (agriculture), 100-year flood, Flood control, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on scheduling scheme of flood divided into stagesforLiangjiang hydropower station — Research Paper | ScholarLens