MONITORING MEASUREMENT AND SAFETY ANALYSIS FOR CONSTRUCTION OF TUNNEL BENEATH PASSENGER TRANSFERRING SUBWAY STATION IN BEIJING
Jin Huai
Abstract
Jin Huai
Abstract
Excavating tunnel under existing passenger transferring subway station is of very importance.Stringent risk assessment and control must be applied to keep operation of the subway station safely.The paper mainly introduces the risk assessment and the third-party monitoring measurement of a new tunnel construction underneath a Beijing Subway Wanshou Road Station.This station is a passenger transferring subway station.The tunnel construction might result the settlement of the subway station structure and make the rail distort.It might impact the safety of station operation.The project used methods of structure measuring,construction numerical simulation and the third-party monitoring measurement.The results show that the station was safe and was operated safely.The results presented in the paper may give a good reference to other similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Excavating tunnel under existing passenger transferring subway station is of very importance.Stringent risk assessment and control must be applied to keep operation of the subway station safely.The paper mainly introduces the risk assessment and the third-party monitoring measurement of a new tunnel construction underneath a Beijing Subway Wanshou Road Station.This station is a passenger transferring subway station.The tunnel construction might result the settlement of the subway station structure and make the rail distort.It might impact the safety of station operation.The project used methods of structure measuring,construction numerical simulation and the third-party monitoring measurement.The results show that the station was safe and was operated safely.The results presented in the paper may give a good reference to other similar projects.
Key concepts: Beijing, Subway station, Engineering, Metro station, Settlement (finance), Tunnel construction, Total station, Transport engineering