2009•Unpublished venueRequires access

MONITORING MEASUREMENT AND SAFETY ANALYSIS FOR CONSTRUCTION OF TUNNEL BENEATH PASSENGER TRANSFERRING SUBWAY STATION IN BEIJING

Jin Huai

Open publisher page 0 citations

Abstract

Excavating tunnel under existing passenger transferring subway station is of very importance.Stringent risk assessment and control must be applied to keep operation of the subway station safely.The paper mainly introduces the risk assessment and the third-party monitoring measurement of a new tunnel construction underneath a Beijing Subway Wanshou Road Station.This station is a passenger transferring subway station.The tunnel construction might result the settlement of the subway station structure and make the rail distort.It might impact the safety of station operation.The project used methods of structure measuring,construction numerical simulation and the third-party monitoring measurement.The results show that the station was safe and was operated safely.The results presented in the paper may give a good reference to other similar projects.

About this research paper

What this paper is about

Excavating tunnel under existing passenger transferring subway station is of very importance.Stringent risk assessment and control must be applied to keep operation of the subway station safely.The paper mainly introduces the risk assessment and the third-party monitoring measurement of a new tunnel construction underneath a Beijing Subway Wanshou Road Station.This station is a passenger transferring subway station.The tunnel construction might result the settlement of the subway station structure and make the rail distort.It might impact the safety of station operation.The project used methods of structure measuring,construction numerical simulation and the third-party monitoring measurement.The results show that the station was safe and was operated safely.The results presented in the paper may give a good reference to other similar projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Excavating tunnel under existing passenger transferring subway station is of very importance.Stringent risk assessment and control must be applied to keep operation of the subway station safely.The paper mainly introduces the risk assessment and the third-party monitoring measurement of a new tunnel construction underneath a Beijing Subway Wanshou Road Station.This station is a passenger transferring subway station.The tunnel construction might result the settlement of the subway station structure and make the rail distort.It might impact the safety of station operation.The project used methods of structure measuring,construction numerical simulation and the third-party monitoring measurement.The results show that the station was safe and was operated safely.The results presented in the paper may give a good reference to other similar projects.

Key concepts: Beijing, Subway station, Engineering, Metro station, Settlement (finance), Tunnel construction, Total station, Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
MONITORING MEASUREMENT AND SAFETY ANALYSIS FOR CONSTRUCTION OF TUNNEL BENEATH PASSENGER TRANSFERRING SUBWAY STATION IN BEIJING — Research Paper | ScholarLens