Construction of Prestressed Continuous Beam of Oblique-pulling Truss of Pizhou Viaduct

MA Kai-mao

Open publisher page 0 citations

Abstract

The Pizhou viaduct on Jinghang Grand Canal is a double-faces and double-towers prestressed oblique-pulling truss.Engineers applied prestress on its upper chord bars,bottom chord bars and some tension members and adopted a series of measures to ensure stress-balance of bars in every construction stage.

About this research paper

What this paper is about

The Pizhou viaduct on Jinghang Grand Canal is a double-faces and double-towers prestressed oblique-pulling truss.Engineers applied prestress on its upper chord bars,bottom chord bars and some tension members and adopted a series of measures to ensure stress-balance of bars in every construction stage.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Pizhou viaduct on Jinghang Grand Canal is a double-faces and double-towers prestressed oblique-pulling truss.Engineers applied prestress on its upper chord bars,bottom chord bars and some tension members and adopted a series of measures to ensure stress-balance of bars in every construction stage.

Key concepts: Truss, Chord (peer-to-peer), Structural engineering, Oblique case, Engineering, Beam (structure), Tension (geology), Moment (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction of Prestressed Continuous Beam of Oblique-pulling Truss of Pizhou Viaduct — Research Paper | ScholarLens