Study on the control range of reservoir′s flood limit water level based on water supply risk
Yin Jun-xian
Abstract
Yin Jun-xian
Abstract
Based on the water supply risk and its variable process of Dalian city, this paper proposes a cost-benefit analysis method for flood resources to inquire into the control range of the reservoir′s flood limit water level, according to the use course of the flood resources and flood range analysis. The result of a case study demonstrates that the proposed flood limit water level of Biliuhe reservoir can go up suitably, along with the step-by-step raise of water supply.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the water supply risk and its variable process of Dalian city, this paper proposes a cost-benefit analysis method for flood resources to inquire into the control range of the reservoir′s flood limit water level, according to the use course of the flood resources and flood range analysis. The result of a case study demonstrates that the proposed flood limit water level of Biliuhe reservoir can go up suitably, along with the step-by-step raise of water supply.
Key concepts: Flood myth, Water supply, Limit (mathematics), Water level, Environmental science, Flood control, Water resource management, Range (aeronautics)