Analysis of Construction Process of Thick Wall Pipe of High Pressure Water Descaling

Tao Yongge

Open publisher page 0 citations

Abstract

The main construction control points summarized in high pressure water descaling pipe construction for 4300 mm wide heavy steel plate project of Laiwu Iron Steel Co.,Ltd.are introduced.The welding construction process of thick wall pipe is emphasized.

About this research paper

What this paper is about

The main construction control points summarized in high pressure water descaling pipe construction for 4300 mm wide heavy steel plate project of Laiwu Iron Steel Co.,Ltd.are introduced.The welding construction process of thick wall pipe is emphasized.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main construction control points summarized in high pressure water descaling pipe construction for 4300 mm wide heavy steel plate project of Laiwu Iron Steel Co.,Ltd.are introduced.The welding construction process of thick wall pipe is emphasized.

Key concepts: High pressure water, Welding, Water pressure, High pressure, Metallurgy, Engineering, Water pipe, Process (computing)

Back to paper searchBrowse research topicsOriginal source
Analysis of Construction Process of Thick Wall Pipe of High Pressure Water Descaling — Research Paper | ScholarLens