2007•Electric Power ConstructionRequires access

Study on Electric Imbalance and Transposition of 750 kV 1-Tower Double-Circuit Transmission Line

Jiangjun Ruan

Open publisher page 2 citations

Abstract

The electric imbalance of 1-tower double-circuit transmission line depends on both conductor spatial arrangement and phase sequence. Therefore, to minimize line imbalance, conductor transposition, as well as proper phase sequence and transposition orientation have to be used. For the east Lanzhou-Pingliang-Qian County 750 kV 1-tower double-circuit transmission line project, it is recommended that conductors should be arranged in reverse phase sequence , and two reverse transpositions,which are applied in east Lanzhou-Pingliang section and Pingliang-Qian County section respectively,should be used to meet the line imbalance limit.

About this research paper

What this paper is about

The electric imbalance of 1-tower double-circuit transmission line depends on both conductor spatial arrangement and phase sequence. Therefore, to minimize line imbalance, conductor transposition, as well as proper phase sequence and transposition orientation have to be used. For the east Lanzhou-Pingliang-Qian County 750 kV 1-tower double-circuit transmission line project, it is recommended that conductors should be arranged in reverse phase sequence , and two reverse transpositions,which are applied in east Lanzhou-Pingliang section and Pingliang-Qian County section respectively,should be used to meet the line imbalance limit.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The electric imbalance of 1-tower double-circuit transmission line depends on both conductor spatial arrangement and phase sequence. Therefore, to minimize line imbalance, conductor transposition, as well as proper phase sequence and transposition orientation have to be used. For the east Lanzhou-Pingliang-Qian County 750 kV 1-tower double-circuit transmission line project, it is recommended that conductors should be arranged in reverse phase sequence , and two reverse transpositions,which are applied in east Lanzhou-Pingliang section and Pingliang-Qian County section respectively,should be used to meet the line imbalance limit.

Key concepts: Transposition (logic), Conductor, Tower, Transmission line, Line (geometry), Electrical conductor, Electrical engineering, Electric power transmission

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Electric Imbalance and Transposition of 750 kV 1-Tower Double-Circuit Transmission Line — Research Paper | ScholarLens