2014Technology of Highway and TransportRequires access

Research on Reasonable Excavation Sequence of Multi-arch Tunnel under Building Bias in Complicated Urban Area Stone Base Asphalt Pavement Structure

Lihu Chen

Open publisher page 0 citations

Abstract

Chongqing Yuzhong Connecting Tunnel is located in the most complicated urban area of Chongqing,the tunnel line is full of high-rise buildings and dense pipe networks,overpasses rail traffic line 6 and underpasses Xiaoshizi Railway Station of rail traffic line 1. Design, construction and management of this tunnel face extreme difficulties,and there are multiple control nodes in construction.By selecting the representative control node in construction-side-through Huaxie Bank section as the object of research,this paper confirms an optimal excavation method of the tunnel in which the right hole is excavated before the left hole via analysis for influence on different excavation sequences on deviation of mid-partition. In addition,the paper analyzes the mechanism of reasonable excavation of the tunnel under the building bias,and the results of research can provide a reference for design and construction of similar tunnels in complicated urban area.

About this research paper

What this paper is about

Chongqing Yuzhong Connecting Tunnel is located in the most complicated urban area of Chongqing,the tunnel line is full of high-rise buildings and dense pipe networks,overpasses rail traffic line 6 and underpasses Xiaoshizi Railway Station of rail traffic line 1. Design, construction and management of this tunnel face extreme difficulties,and there are multiple control nodes in construction.By selecting the representative control node in construction-side-through Huaxie Bank section as the object of research,this paper confirms an optimal excavation method of the tunnel in which the right hole is excavated before the left hole via analysis for influence on different excavation sequences on deviation of mid-partition. In addition,the paper analyzes the mechanism of reasonable excavation of the tunnel under the building bias,and the results of research can provide a reference for design and construction of similar tunnels in complicated urban area.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Chongqing Yuzhong Connecting Tunnel is located in the most complicated urban area of Chongqing,the tunnel line is full of high-rise buildings and dense pipe networks,overpasses rail traffic line 6 and underpasses Xiaoshizi Railway Station of rail traffic line 1. Design, construction and management of this tunnel face extreme difficulties,and there are multiple control nodes in construction.By selecting the representative control node in construction-side-through Huaxie Bank section as the object of research,this paper confirms an optimal excavation method of the tunnel in which the right hole is excavated before the left hole via analysis for influence on different excavation sequences on deviation of mid-partition. In addition,the paper analyzes the mechanism of reasonable excavation of the tunnel under the building bias,and the results of research can provide a reference for design and construction of similar tunnels in complicated urban area.

Key concepts: Excavation, Arch, Engineering, Site analysis, Civil engineering, Research Object, Geotechnical engineering, Mining engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Reasonable Excavation Sequence of Multi-arch Tunnel under Building Bias in Complicated Urban Area Stone Base Asphalt Pavement Structure — Research Paper | ScholarLens