Analysis on Plan of Keeping the Capability of Sediment and Water Discharge of the Lower Yellow River Channel

Wang Min

Open publisher page 0 citations

Abstract

It calculates and analyzes the variations of scouring and bankfull discharge by using mathematical model of hydrody-namics and sediment scouring of the lower Yellow River and using 3 twenty years sediment discharge series.The outcomes show that a) each section is in the state of scouring in the first 10 years of sediment discharge series and deposition happens in the second 10 years;b) only series 2 can keep the bankfull discharge greater than 4,000 m3/s in the whole lower river channel;c) the silt-discharge process for forming the channel in the first 10 years is rational,basically achieving the target of stable and increased bankfull discharge and the bankfull discharge is reduced to varying degrees in the second 10 years and;d) it should try to control the sediment concentration of outflow of the Xiaolangdi Reservoir less than 200 kg/m3 and the specific gravity of fine sands greater than 75%.

About this research paper

What this paper is about

It calculates and analyzes the variations of scouring and bankfull discharge by using mathematical model of hydrody-namics and sediment scouring of the lower Yellow River and using 3 twenty years sediment discharge series.The outcomes show that a) each section is in the state of scouring in the first 10 years of sediment discharge series and deposition happens in the second 10 years;b) only series 2 can keep the bankfull discharge greater than 4,000 m3/s in the whole lower river channel;c) the silt-discharge process for forming the channel in the first 10 years is rational,basically achieving the target of stable and increased bankfull discharge and the bankfull discharge is reduced to varying degrees in the second 10 years and;d) it should try to control the sediment concentration of outflow of the Xiaolangdi Reservoir less than 200 kg/m3 and the specific gravity of fine sands greater than 75%.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It calculates and analyzes the variations of scouring and bankfull discharge by using mathematical model of hydrody-namics and sediment scouring of the lower Yellow River and using 3 twenty years sediment discharge series.The outcomes show that a) each section is in the state of scouring in the first 10 years of sediment discharge series and deposition happens in the second 10 years;b) only series 2 can keep the bankfull discharge greater than 4,000 m3/s in the whole lower river channel;c) the silt-discharge process for forming the channel in the first 10 years is rational,basically achieving the target of stable and increased bankfull discharge and the bankfull discharge is reduced to varying degrees in the second 10 years and;d) it should try to control the sediment concentration of outflow of the Xiaolangdi Reservoir less than 200 kg/m3 and the specific gravity of fine sands greater than 75%.

Key concepts: Sediment, Hydrology (agriculture), Channel (broadcasting), Silt, Water discharge, Outflow, Deposition (geology), Discharge

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis on Plan of Keeping the Capability of Sediment and Water Discharge of the Lower Yellow River Channel — Research Paper | ScholarLens