2009Rock and Soil MechanicsRequires access

Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation

Mingfeng Lei

Open publisher page 2 citations

Abstract

Based on the two hypotheses:(1) the force on shield working force is round and well-distribution;(2) the frictional force between the out surface of shield and surrounding soil is also well-distribution;the mechanical calculation model of shield is established by using the classical elastic theory of Mindlin. In this model,the changeable location of shield is considered when shield is working. Then the stratum deformation calculating formulas around tunnel caused by the additional force on the shield working force and the frictional force between the out surface of shield and surrounding soil are deduced. According to the stochastic medium theory,the stratum deformation caused by the loss of stratum which resulted from shield tunnel construction is deduced,in which the time-space effect of stratum deformation caused by tunnel construction is considered. A case of history is calculated and the time-space change rules of stratum deformation are studied finally.

About this research paper

What this paper is about

Based on the two hypotheses:(1) the force on shield working force is round and well-distribution;(2) the frictional force between the out surface of shield and surrounding soil is also well-distribution;the mechanical calculation model of shield is established by using the classical elastic theory of Mindlin. In this model,the changeable location of shield is considered when shield is working. Then the stratum deformation calculating formulas around tunnel caused by the additional force on the shield working force and the frictional force between the out surface of shield and surrounding soil are deduced. According to the stochastic medium theory,the stratum deformation caused by the loss of stratum which resulted from shield tunnel construction is deduced,in which the time-space effect of stratum deformation caused by tunnel construction is considered. A case of history is calculated and the time-space change rules of stratum deformation are studied finally.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the two hypotheses:(1) the force on shield working force is round and well-distribution;(2) the frictional force between the out surface of shield and surrounding soil is also well-distribution;the mechanical calculation model of shield is established by using the classical elastic theory of Mindlin. In this model,the changeable location of shield is considered when shield is working. Then the stratum deformation calculating formulas around tunnel caused by the additional force on the shield working force and the frictional force between the out surface of shield and surrounding soil are deduced. According to the stochastic medium theory,the stratum deformation caused by the loss of stratum which resulted from shield tunnel construction is deduced,in which the time-space effect of stratum deformation caused by tunnel construction is considered. A case of history is calculated and the time-space change rules of stratum deformation are studied finally.

Key concepts: Shield, Stratum, Deformation (meteorology), Excavation, Geotechnical engineering, Geology, Surface (topology), Mechanics

Related papers

Back to paper searchBrowse research topicsOriginal source
Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation — Research Paper | ScholarLens