2004Yellow RiverRequires access

The Third Test of Water and Sediment Regulation Conducted on the Yellow River

Liping Li

Open publisher page 6 citations

Abstract

The third test of water and sediment regulation of Yellow River is conducted in period from June 19 to July 13, 2004. The test has created artificial density current in Xiaolangdi Reservoir area, regulated sedimentation behavior which is unfavorable to tail reach of reservoir, increased sediment discharging capacity and decreased siltation of reservoir through utilizing reservoir storage before flood season, fully having aid of natural power and reservoirs joint operation of Wanjiazhai, Sanmenxia and Xiaolangdi located on main stream of Yellow River and assisting with measures of artificial sediment disturbance. At same time, it has conducted sediment disturbance at the secondary suspended of lower reaches and natural channel-control section where sedimentation is most serious, reducing sedimentation in lower channel and increased flood capability of main channel in lower river by utilizing surplus capability of sediment carrying of water flowing into lower channel. It has achieved expected effects as follows: 132.9 million m~3 sediment deposited in Xiaolangdi Reservoir area has been washed out and all 38.5 million m~3 sediment deposited above longitudinal profile of designed sedimentation balance washed away, rationally regulating sedimentation behavior of tail reach of reservoir; 1.641 3 million m~3 sediment at natural channel-control section of downstream disturbed and 510~640 m~3/s bankfull discharge at disturbed section increased and; each section above Lijin on lower reaches scoured and all together 64.22 million tons of sediment in Xiaolangdi-Lijin reach washed out.

About this research paper

What this paper is about

The third test of water and sediment regulation of Yellow River is conducted in period from June 19 to July 13, 2004. The test has created artificial density current in Xiaolangdi Reservoir area, regulated sedimentation behavior which is unfavorable to tail reach of reservoir, increased sediment discharging capacity and decreased siltation of reservoir through utilizing reservoir storage before flood season, fully having aid of natural power and reservoirs joint operation of Wanjiazhai, Sanmenxia and Xiaolangdi located on main stream of Yellow River and assisting with measures of artificial sediment disturbance. At same time, it has conducted sediment disturbance at the secondary suspended of lower reaches and natural channel-control section where sedimentation is most serious, reducing sedimentation in lower channel and increased flood capability of main channel in lower river by utilizing surplus capability of sediment carrying of water flowing into lower channel. It has achieved expected effects as follows: 132.9 million m~3 sediment deposited in Xiaolangdi Reservoir area has been washed out and all 38.5 million m~3 sediment deposited above longitudinal profile of designed sedimentation balance washed away, rationally regulating sedimentation behavior of tail reach of reservoir; 1.641 3 million m~3 sediment at natural channel-control section of downstream disturbed and 510~640 m~3/s bankfull discharge at disturbed section increased and; each section above Lijin on lower reaches scoured and all together 64.22 million tons of sediment in Xiaolangdi-Lijin reach washed out.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The third test of water and sediment regulation of Yellow River is conducted in period from June 19 to July 13, 2004. The test has created artificial density current in Xiaolangdi Reservoir area, regulated sedimentation behavior which is unfavorable to tail reach of reservoir, increased sediment discharging capacity and decreased siltation of reservoir through utilizing reservoir storage before flood season, fully having aid of natural power and reservoirs joint operation of Wanjiazhai, Sanmenxia and Xiaolangdi located on main stream of Yellow River and assisting with measures of artificial sediment disturbance. At same time, it has conducted sediment disturbance at the secondary suspended of lower reaches and natural channel-control section where sedimentation is most serious, reducing sedimentation in lower channel and increased flood capability of main channel in lower river by utilizing surplus capability of sediment carrying of water flowing into lower channel. It has achieved expected effects as follows: 132.9 million m~3 sediment deposited in Xiaolangdi Reservoir area has been washed out and all 38.5 million m~3 sediment deposited above longitudinal profile of designed sedimentation balance washed away, rationally regulating sedimentation behavior of tail reach of reservoir; 1.641 3 million m~3 sediment at natural channel-control section of downstream disturbed and 510~640 m~3/s bankfull discharge at disturbed section increased and; each section above Lijin on lower reaches scoured and all together 64.22 million tons of sediment in Xiaolangdi-Lijin reach washed out.

Key concepts: Sedimentation, Siltation, Sediment, Hydrology (agriculture), Channel (broadcasting), Sedimentary budget, Flood myth, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
The Third Test of Water and Sediment Regulation Conducted on the Yellow River — Research Paper | ScholarLens