2013World BridgesRequires access

Design and Construction of New Shah Amanat Bridge in Bengal

Jiang Ai-guo, Cccc Second

Open publisher page 0 citations

Abstract

The main bridge of the New Shah Amanat Bridge is a continuous prestressed box girder extradosed bridge with span arrangement of(115+3×200+115) m.The main girder adopts the type of single cell box girder with thin walls and with diagonal struts installed inside the box.The stay cables,arranged in single cable plane,are threaded through the pylons via the deviation saddle tubes installed in the upper pylon columns,the two ends of the stay cables are anchored to the connection point of the top plate of the main girder and the diagonal strut.The pylon is composed of pedestal,lower pylon column and upper pylon column.The sections No.0 and No.1 of the box girder of the superstructure were all cast in-situ on the scaffoldings and temporarily fixed to the pier top to form T frames.The remaining sections of the main girder were constructed by balanced cantilever cast,using the triangular form traveler,and the closure section was erected by lifting frames.The cast-in-situ sections of the box girder in the side spans were cast on scaffoldings.The pylon was cast step by step using set-shaped steel formwork.In order to facilitate the installation of the form traveler for box girder casting,the construction of the stay cables was carried out one section lagging behind the box girder construction.The structural characteristics of the bridge enable the engineering economy of extradosed bridge to play to the utmost.

About this research paper

What this paper is about

The main bridge of the New Shah Amanat Bridge is a continuous prestressed box girder extradosed bridge with span arrangement of(115+3×200+115) m.The main girder adopts the type of single cell box girder with thin walls and with diagonal struts installed inside the box.The stay cables,arranged in single cable plane,are threaded through the pylons via the deviation saddle tubes installed in the upper pylon columns,the two ends of the stay cables are anchored to the connection point of the top plate of the main girder and the diagonal strut.The pylon is composed of pedestal,lower pylon column and upper pylon column.The sections No.0 and No.1 of the box girder of the superstructure were all cast in-situ on the scaffoldings and temporarily fixed to the pier top to form T frames.The remaining sections of the main girder were constructed by balanced cantilever cast,using the triangular form traveler,and the closure section was erected by lifting frames.The cast-in-situ sections of the box girder in the side spans were cast on scaffoldings.The pylon was cast step by step using set-shaped steel formwork.In order to facilitate the installation of the form traveler for box girder casting,the construction of the stay cables was carried out one section lagging behind the box girder construction.The structural characteristics of the bridge enable the engineering economy of extradosed bridge to play to the utmost.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main bridge of the New Shah Amanat Bridge is a continuous prestressed box girder extradosed bridge with span arrangement of(115+3×200+115) m.The main girder adopts the type of single cell box girder with thin walls and with diagonal struts installed inside the box.The stay cables,arranged in single cable plane,are threaded through the pylons via the deviation saddle tubes installed in the upper pylon columns,the two ends of the stay cables are anchored to the connection point of the top plate of the main girder and the diagonal strut.The pylon is composed of pedestal,lower pylon column and upper pylon column.The sections No.0 and No.1 of the box girder of the superstructure were all cast in-situ on the scaffoldings and temporarily fixed to the pier top to form T frames.The remaining sections of the main girder were constructed by balanced cantilever cast,using the triangular form traveler,and the closure section was erected by lifting frames.The cast-in-situ sections of the box girder in the side spans were cast on scaffoldings.The pylon was cast step by step using set-shaped steel formwork.In order to facilitate the installation of the form traveler for box girder casting,the construction of the stay cables was carried out one section lagging behind the box girder construction.The structural characteristics of the bridge enable the engineering economy of extradosed bridge to play to the utmost.

Key concepts: Pylon, Box girder, Structural engineering, Engineering, Formwork, Girder, Bridge (graph theory), Saddle

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Construction of New Shah Amanat Bridge in Bengal — Research Paper | ScholarLens