Model Tests and Comparative Study of the Pylon's Anchorage Zone of Two Long-span Cablae-stayed Bridges
PC Structures
Abstract
PC Structures
Abstract
Two model tests for pylon's anchorage zone of two long span cable stayed bridges, the Second Nanjing Yangtze River Bridge and the Runyang Yangtze River Bridge, are expounded in this paper. Safety factors for cracking and ultimate strength are obtained. The optimal configuration of prestress tendons in anchorage zone, and the emulation effects of segment model test to integral pylon are investigated. The results can be a reference for the design of pylon of cable stayed bridges.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Two model tests for pylon's anchorage zone of two long span cable stayed bridges, the Second Nanjing Yangtze River Bridge and the Runyang Yangtze River Bridge, are expounded in this paper. Safety factors for cracking and ultimate strength are obtained. The optimal configuration of prestress tendons in anchorage zone, and the emulation effects of segment model test to integral pylon are investigated. The results can be a reference for the design of pylon of cable stayed bridges.
Key concepts: Pylon, Yangtze river, Structural engineering, Span (engineering), Bridge (graph theory), Emulation, Engineering, Cracking