2008Shanxi ArchitectureRequires access

Construction technology of block 0 and block 1 of the continuous beam of Bajianghe large Bridge

Liang We

Open publisher page 0 citations

Abstract

In order to ensure the construction quality and the safety of the prestressed concrete continuous girder with variable section of Bajianghe large Bridge,the author analyzes the construction technology and the construction process control,puts forward the construction scheme of the construction procedure of the brackets perpressing,the concrete pouring and the prestress tension,achieves the expected effect of the construction,solves the common problems successfully in the construction of block 0 and block 1 of the continuous beam.

About this research paper

What this paper is about

In order to ensure the construction quality and the safety of the prestressed concrete continuous girder with variable section of Bajianghe large Bridge,the author analyzes the construction technology and the construction process control,puts forward the construction scheme of the construction procedure of the brackets perpressing,the concrete pouring and the prestress tension,achieves the expected effect of the construction,solves the common problems successfully in the construction of block 0 and block 1 of the continuous beam.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to ensure the construction quality and the safety of the prestressed concrete continuous girder with variable section of Bajianghe large Bridge,the author analyzes the construction technology and the construction process control,puts forward the construction scheme of the construction procedure of the brackets perpressing,the concrete pouring and the prestress tension,achieves the expected effect of the construction,solves the common problems successfully in the construction of block 0 and block 1 of the continuous beam.

Key concepts: Bridge (graph theory), Block (permutation group theory), Engineering, Structural engineering, Beam (structure), Box girder, Process (computing), Girder

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction technology of block 0 and block 1 of the continuous beam of Bajianghe large Bridge — Research Paper | ScholarLens