Discussion on the engineering claim strategy of contractor

Wang Rong-ron

Open publisher page 0 citations

Abstract

Aiming at the problem of how to reach the claim aim smoothly and not demanding the cooperative relationship of two parts and self reputation,the engineering claim strategy of contractor was analyzed from claim aim,management strategy,foreign relations and process of bargaining,so as to solve the problem of low success rate on engineering claim carried out by contractor.

About this research paper

What this paper is about

Aiming at the problem of how to reach the claim aim smoothly and not demanding the cooperative relationship of two parts and self reputation,the engineering claim strategy of contractor was analyzed from claim aim,management strategy,foreign relations and process of bargaining,so as to solve the problem of low success rate on engineering claim carried out by contractor.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aiming at the problem of how to reach the claim aim smoothly and not demanding the cooperative relationship of two parts and self reputation,the engineering claim strategy of contractor was analyzed from claim aim,management strategy,foreign relations and process of bargaining,so as to solve the problem of low success rate on engineering claim carried out by contractor.

Key concepts: Reputation, Process (computing), Business, Operations management, Engineering, Process management, Computer science, Political science

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on the engineering claim strategy of contractor — Research Paper | ScholarLens