On principle for post-grouting technique of pile and exploration of improvement of loading capacity
Yang Wen-pen
Abstract
Yang Wen-pen
Abstract
The paper indicates from the basic principle of the post-grouting technique of bored pile,the factors which influence the loading capacity of bored piles and the mechanism to improve the loading capacity of the single pile of bored pile,and introduces the grouting technique of pile bottom and pile side,so as to improve the pile's loading capacity and obtain better technical and economical benefits.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper indicates from the basic principle of the post-grouting technique of bored pile,the factors which influence the loading capacity of bored piles and the mechanism to improve the loading capacity of the single pile of bored pile,and introduces the grouting technique of pile bottom and pile side,so as to improve the pile's loading capacity and obtain better technical and economical benefits.
Key concepts: Pile, Geotechnical engineering, Bearing capacity, Engineering, Structural engineering, Mechanism (biology), Geology, Epistemology