Establishment of the High Accuracy Construction Control Network of Yangtze River and Dongting Lake Flood Prevention Model
Bo Hu
Abstract
Bo Hu
Abstract
Considering the construction need of the Yangtze River and the Dongting Lake flood prevention model, in order to simulate Yangtze River, Dongting Lake in the flood period condition, the thesis carried on the dis-cussion to the correlation technology and the method, the establishment of construction control network has de-finitely been possible to achieve the stipulation the precision request.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Considering the construction need of the Yangtze River and the Dongting Lake flood prevention model, in order to simulate Yangtze River, Dongting Lake in the flood period condition, the thesis carried on the dis-cussion to the correlation technology and the method, the establishment of construction control network has de-finitely been possible to achieve the stipulation the precision request.
Key concepts: Stipulation, Flood control, Yangtze river, Flood myth, Hydrology (agriculture), Flood prevention, Water resource management, Environmental science