2005•Drilling & Production TechnologyRequires access

DISCUSSION ON THE WELLBORE DEVIATION CONTROLLING IN AIR DRILLING

Xiaoqing Lai

Open publisher page 0 citations

Abstract

The penetration rate is rapidly increased by air drilling, but the wellbore deviation is not controlled easily. The paper introduces controlled and uncontrolled factors of influencing deviation in air drilling including BHA, bit weight, speed of rotation, formation anisotropism and stratigraphic dip etc. parameter, analyses control deviation technique of air hammer, discusses the reason of the deviation uncontrolled by air hammer in well Long 15. On the basis of the air drilling experiment in Qingxi oilfield, the result shows that fanning the bottom can achieve the goal of reduced deviation. It is a guide for design and operation of air drilling in future.

About this research paper

What this paper is about

The penetration rate is rapidly increased by air drilling, but the wellbore deviation is not controlled easily. The paper introduces controlled and uncontrolled factors of influencing deviation in air drilling including BHA, bit weight, speed of rotation, formation anisotropism and stratigraphic dip etc. parameter, analyses control deviation technique of air hammer, discusses the reason of the deviation uncontrolled by air hammer in well Long 15. On the basis of the air drilling experiment in Qingxi oilfield, the result shows that fanning the bottom can achieve the goal of reduced deviation. It is a guide for design and operation of air drilling in future.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The penetration rate is rapidly increased by air drilling, but the wellbore deviation is not controlled easily. The paper introduces controlled and uncontrolled factors of influencing deviation in air drilling including BHA, bit weight, speed of rotation, formation anisotropism and stratigraphic dip etc. parameter, analyses control deviation technique of air hammer, discusses the reason of the deviation uncontrolled by air hammer in well Long 15. On the basis of the air drilling experiment in Qingxi oilfield, the result shows that fanning the bottom can achieve the goal of reduced deviation. It is a guide for design and operation of air drilling in future.

Key concepts: Wellbore, Drilling, Hammer, Petroleum engineering, Rate of penetration, Measurement while drilling, Penetration rate, Directional drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
DISCUSSION ON THE WELLBORE DEVIATION CONTROLLING IN AIR DRILLING — Research Paper | ScholarLens