Roof Stability Analysis of Sublevel Open Stope and Caving Mining Method

Fengyu Ren

Open publisher page 3 citations

Abstract

The hanging wall and footwall of the ⅪV1 main ore body are unstable in Fengzishan lead-zinc deposit.The improved sublevel open stope and caving method was tested.Using three-di-mensional finite element,the stability analysis of protective pillar and insulating pillar was presented.The distribution of stress,safety rate and plastic zone was analyzed,and the reasonable stope structural parameters were optimized in the four schemes.The results indicate that the thickness of protective layer has a significant influence on the roof stability,which improves with the increase of stope span during the room stoping.In addition,the roof stability decreases with the increase of stope span.It can effectively ensure the stope stability to select the suitable protective layer thickness and to control the stope span.The results can provide theoretical basis for the mining design and strata control.

About this research paper

What this paper is about

The hanging wall and footwall of the ⅪV1 main ore body are unstable in Fengzishan lead-zinc deposit.The improved sublevel open stope and caving method was tested.Using three-di-mensional finite element,the stability analysis of protective pillar and insulating pillar was presented.The distribution of stress,safety rate and plastic zone was analyzed,and the reasonable stope structural parameters were optimized in the four schemes.The results indicate that the thickness of protective layer has a significant influence on the roof stability,which improves with the increase of stope span during the room stoping.In addition,the roof stability decreases with the increase of stope span.It can effectively ensure the stope stability to select the suitable protective layer thickness and to control the stope span.The results can provide theoretical basis for the mining design and strata control.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The hanging wall and footwall of the ⅪV1 main ore body are unstable in Fengzishan lead-zinc deposit.The improved sublevel open stope and caving method was tested.Using three-di-mensional finite element,the stability analysis of protective pillar and insulating pillar was presented.The distribution of stress,safety rate and plastic zone was analyzed,and the reasonable stope structural parameters were optimized in the four schemes.The results indicate that the thickness of protective layer has a significant influence on the roof stability,which improves with the increase of stope span during the room stoping.In addition,the roof stability decreases with the increase of stope span.It can effectively ensure the stope stability to select the suitable protective layer thickness and to control the stope span.The results can provide theoretical basis for the mining design and strata control.

Key concepts: Roof, Pillar, Geotechnical engineering, Stoping, Span (engineering), Finite element method, Stability (learning theory), Mining engineering