Study on Optimal Layout of Flood Discharge and Energy Dissipation for Hujiaya Hydropower Station
Zhen Wang
Abstract
Zhen Wang
Abstract
The scheme of flood discharge and energy dissipation was made use of dam and gate conjointly for Hujiaya hydropower station,Quzhou county,Gansu.It was demonstrated by hydraulic model test that the scheme is feasible.Optimization was conducted for the problems of flow regime caused by the upper reach guide wall and scour caused by energy dissipation structure.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The scheme of flood discharge and energy dissipation was made use of dam and gate conjointly for Hujiaya hydropower station,Quzhou county,Gansu.It was demonstrated by hydraulic model test that the scheme is feasible.Optimization was conducted for the problems of flow regime caused by the upper reach guide wall and scour caused by energy dissipation structure.
Key concepts: Hydropower, Dissipation, Flood myth, Environmental science, Small hydro, Flow (mathematics), Hydroelectricity, Civil engineering