2004Shanxi ArchitectureRequires access

Construction technology of cast-in-place bored pile to treat shifting sand layer in Emaohe Bridge work

Zhang You-quan

Open publisher page 0 citations

Abstract

Taking the pile foundation work of Emaohe Bridge in Dayun expressway as example, in view of the geological condition that construction on shifting sand layer the prevention and technical treatment are elaborated for cast-in-place bored pile construction in order to ensure construction quality of them.

About this research paper

What this paper is about

Taking the pile foundation work of Emaohe Bridge in Dayun expressway as example, in view of the geological condition that construction on shifting sand layer the prevention and technical treatment are elaborated for cast-in-place bored pile construction in order to ensure construction quality of them.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking the pile foundation work of Emaohe Bridge in Dayun expressway as example, in view of the geological condition that construction on shifting sand layer the prevention and technical treatment are elaborated for cast-in-place bored pile construction in order to ensure construction quality of them.

Key concepts: Pile, Bridge (graph theory), Foundation (evidence), Work (physics), Engineering, Civil engineering, Geotechnical engineering, Layer (electronics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction technology of cast-in-place bored pile to treat shifting sand layer in Emaohe Bridge work — Research Paper | ScholarLens