Construction technology of cast-in-place bored pile to treat shifting sand layer in Emaohe Bridge work
Zhang You-quan
Abstract
Zhang You-quan
Abstract
Taking the pile foundation work of Emaohe Bridge in Dayun expressway as example, in view of the geological condition that construction on shifting sand layer the prevention and technical treatment are elaborated for cast-in-place bored pile construction in order to ensure construction quality of them.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking the pile foundation work of Emaohe Bridge in Dayun expressway as example, in view of the geological condition that construction on shifting sand layer the prevention and technical treatment are elaborated for cast-in-place bored pile construction in order to ensure construction quality of them.
Key concepts: Pile, Bridge (graph theory), Foundation (evidence), Work (physics), Engineering, Civil engineering, Geotechnical engineering, Layer (electronics)