Study on Mechanism and Effect Factors of Reservoir Bank Rebuilding
Guoqing Fang
Abstract
Guoqing Fang
Abstract
Reservoir bank rebuilding is one of the most important environment geological disasters in reservoir area,it not only influences the security of the reservoir function and construction,but also endangers the safety of people's life and property by the two river bank,so the harmfulness must be nipped in the bud.Based on systematical investigations of the bank rebuilding history,actuality and prediction in the Three Gorges reservoir,the Sanmenxia reservoir,the Shuikou reservoir,etc,the characters and mechanism of reservoir bank rebuilding distortion and breakage are analyzed and summarized synthetically,the failure models and the rebuilding types are compartmentalized,the development course and rule of the rebuilding are posted,and the great effect factors of reservoir bank ruin are expatiated,it offers references for the study of bank ruin prediction methods,the engineering programming designs and the construction management about the migration allocation,the means of transportation,reservoir bank protection,etc.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Reservoir bank rebuilding is one of the most important environment geological disasters in reservoir area,it not only influences the security of the reservoir function and construction,but also endangers the safety of people's life and property by the two river bank,so the harmfulness must be nipped in the bud.Based on systematical investigations of the bank rebuilding history,actuality and prediction in the Three Gorges reservoir,the Sanmenxia reservoir,the Shuikou reservoir,etc,the characters and mechanism of reservoir bank rebuilding distortion and breakage are analyzed and summarized synthetically,the failure models and the rebuilding types are compartmentalized,the development course and rule of the rebuilding are posted,and the great effect factors of reservoir bank ruin are expatiated,it offers references for the study of bank ruin prediction methods,the engineering programming designs and the construction management about the migration allocation,the means of transportation,reservoir bank protection,etc.
Key concepts: Three gorges, Engineering, Civil engineering, Geotechnical engineering