2013•BlastingRequires access

Blasting Design of 1185m Level Bench of Heidaigou Open-pit Coal Mine

Gong Yu-cheng

Open publisher page 1 citations

Abstract

To guarantee production safety and to improve the economic benefit of Heidaigou open-pit coal mine,the blasting design of level 1185 was optimized according to the specific condition and blasting requirement,and suitable blasting method was applied in main stope.According to the characteristics of covering rock on the coal seam,the high bench cast blasting method with pouring pile by using shovel was chosen.When the related blasting parameters were calculated and optimized,the final blasting scheme was determined,by which the cost of mine production was reduced greatly.

About this research paper

What this paper is about

To guarantee production safety and to improve the economic benefit of Heidaigou open-pit coal mine,the blasting design of level 1185 was optimized according to the specific condition and blasting requirement,and suitable blasting method was applied in main stope.According to the characteristics of covering rock on the coal seam,the high bench cast blasting method with pouring pile by using shovel was chosen.When the related blasting parameters were calculated and optimized,the final blasting scheme was determined,by which the cost of mine production was reduced greatly.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To guarantee production safety and to improve the economic benefit of Heidaigou open-pit coal mine,the blasting design of level 1185 was optimized according to the specific condition and blasting requirement,and suitable blasting method was applied in main stope.According to the characteristics of covering rock on the coal seam,the high bench cast blasting method with pouring pile by using shovel was chosen.When the related blasting parameters were calculated and optimized,the final blasting scheme was determined,by which the cost of mine production was reduced greatly.

Key concepts: Rock blasting, Shovel, Coal mining, Drilling and blasting, Mining engineering, Open-pit mining, Engineering, Coal