The mechanism of nonuniform settlement of largescale building with collapsible loess ground was deeply analyzed and its treatment strategy was presented in this paper. The chemical churning pile, as a suitable method, was used to deal with such ground accident. The authors analyzed the cause of formation of nonuniform ground settlement, discussed the factors of foundation design and construction control. Practice shows that the chemical churning pile is an effective way to deal with similar ground settlement accident caused by multifactor.

About this research paper

What this paper is about

The mechanism of nonuniform settlement of largescale building with collapsible loess ground was deeply analyzed and its treatment strategy was presented in this paper. The chemical churning pile, as a suitable method, was used to deal with such ground accident. The authors analyzed the cause of formation of nonuniform ground settlement, discussed the factors of foundation design and construction control. Practice shows that the chemical churning pile is an effective way to deal with similar ground settlement accident caused by multifactor.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The mechanism of nonuniform settlement of largescale building with collapsible loess ground was deeply analyzed and its treatment strategy was presented in this paper. The chemical churning pile, as a suitable method, was used to deal with such ground accident. The authors analyzed the cause of formation of nonuniform ground settlement, discussed the factors of foundation design and construction control. Practice shows that the chemical churning pile is an effective way to deal with similar ground settlement accident caused by multifactor.

Key concepts: Churning, Settlement (finance), Pile, Loess, Foundation (evidence), Civil engineering, Engineering, Geotechnical engineering