2002Unpublished venueRequires access

Determination of design return period for urban storm-drainage systems

Hui Wang

Open publisher page 0 citations

Abstract

With the feasibility study of the storm-drainage system in Yizhen City of Jiangsu Province as an example, the influences of design return period on the construction cost of the storm-drainage system are analyzed. It is pointed out that the determination of the design return period should be done for each catchment according to function regionalization, so that the storm-drainage system can meet the requirement of drainage and economy. Finally, some suggestions are proposed for improvement of standards for design rainfall return period.

About this research paper

What this paper is about

With the feasibility study of the storm-drainage system in Yizhen City of Jiangsu Province as an example, the influences of design return period on the construction cost of the storm-drainage system are analyzed. It is pointed out that the determination of the design return period should be done for each catchment according to function regionalization, so that the storm-drainage system can meet the requirement of drainage and economy. Finally, some suggestions are proposed for improvement of standards for design rainfall return period.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With the feasibility study of the storm-drainage system in Yizhen City of Jiangsu Province as an example, the influences of design return period on the construction cost of the storm-drainage system are analyzed. It is pointed out that the determination of the design return period should be done for each catchment according to function regionalization, so that the storm-drainage system can meet the requirement of drainage and economy. Finally, some suggestions are proposed for improvement of standards for design rainfall return period.

Key concepts: Return period, Drainage, Storm, Drainage system (geomorphology), Drainage basin, Environmental science, Hydrology (agriculture), Period (music)

Related papers

Back to paper searchBrowse research topicsOriginal source
Determination of design return period for urban storm-drainage systems — Research Paper | ScholarLens