Design and Implementation of GPS Control Survey Network for Coal Mine Special Railway Lines of Zhaogu No.1 Coal Mine

Zhan Wen-chao

Open publisher page 0 citations

Abstract

This paper introduced the design plan and data treatment method of GPS control survey network for coal mine special railway lines from Guhanshan to Zhaogu No.1 coal mine.In this paper,the author analyzed the measurement accuracy of the control survey network,made a comparison on the height difference accuracy between GPS fitting height and leveling height,pointed out that replacing the level height with fitting height was feasible.Application practices show that the laying out method and the measurement procedure of narrow band network with short-side is simple and easy to use,the whole efficiency is high.

About this research paper

What this paper is about

This paper introduced the design plan and data treatment method of GPS control survey network for coal mine special railway lines from Guhanshan to Zhaogu No.1 coal mine.In this paper,the author analyzed the measurement accuracy of the control survey network,made a comparison on the height difference accuracy between GPS fitting height and leveling height,pointed out that replacing the level height with fitting height was feasible.Application practices show that the laying out method and the measurement procedure of narrow band network with short-side is simple and easy to use,the whole efficiency is high.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper introduced the design plan and data treatment method of GPS control survey network for coal mine special railway lines from Guhanshan to Zhaogu No.1 coal mine.In this paper,the author analyzed the measurement accuracy of the control survey network,made a comparison on the height difference accuracy between GPS fitting height and leveling height,pointed out that replacing the level height with fitting height was feasible.Application practices show that the laying out method and the measurement procedure of narrow band network with short-side is simple and easy to use,the whole efficiency is high.

Key concepts: Control network, Coal mining, Global Positioning System, Plan (archaeology), Control (management), Coal, Engineering, Mining engineering