Design and Implementation of GPS Control Survey Network for Coal Mine Special Railway Lines of Zhaogu No.1 Coal Mine
Zhan Wen-chao
Abstract
Zhan Wen-chao
Abstract
This paper introduced the design plan and data treatment method of GPS control survey network for coal mine special railway lines from Guhanshan to Zhaogu No.1 coal mine.In this paper,the author analyzed the measurement accuracy of the control survey network,made a comparison on the height difference accuracy between GPS fitting height and leveling height,pointed out that replacing the level height with fitting height was feasible.Application practices show that the laying out method and the measurement procedure of narrow band network with short-side is simple and easy to use,the whole efficiency is high.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduced the design plan and data treatment method of GPS control survey network for coal mine special railway lines from Guhanshan to Zhaogu No.1 coal mine.In this paper,the author analyzed the measurement accuracy of the control survey network,made a comparison on the height difference accuracy between GPS fitting height and leveling height,pointed out that replacing the level height with fitting height was feasible.Application practices show that the laying out method and the measurement procedure of narrow band network with short-side is simple and easy to use,the whole efficiency is high.
Key concepts: Control network, Coal mining, Global Positioning System, Plan (archaeology), Control (management), Coal, Engineering, Mining engineering