Construction control for deep cement-mixed pile in soft soil foundation treatment
Tan Xiao-lon
Abstract
Tan Xiao-lon
Abstract
Combined with practical work working mechanism of deep cementmixed pile in foundation reinforcement is introduced.In this paper from preparation work,test pile,construction flow,design parameters,construction control,quality inspection and other aspects construction technology of deep cement-mixed pile is elaborated in detail in order to promote the application of this pile.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with practical work working mechanism of deep cementmixed pile in foundation reinforcement is introduced.In this paper from preparation work,test pile,construction flow,design parameters,construction control,quality inspection and other aspects construction technology of deep cement-mixed pile is elaborated in detail in order to promote the application of this pile.
Key concepts: Pile, Foundation (evidence), Engineering, Cement, Geotechnical engineering, Work (physics), Work flow, Civil engineering