Erection Techniques for 50-m T-Girders of Yangpinghe River Bridge on Sanling Expressway
Huang Xian
Abstract
Huang Xian
Abstract
This paper presents the erection method for 50m Tgirders of Yangpinghe River Bridge with overhead launching gantry, and matters of attention, particularly the solutions to some special problems in the course of the erection, which may serve as reference to the construction of the bridges under similar conditions.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper presents the erection method for 50m Tgirders of Yangpinghe River Bridge with overhead launching gantry, and matters of attention, particularly the solutions to some special problems in the course of the erection, which may serve as reference to the construction of the bridges under similar conditions.
Key concepts: Girder, Bridge (graph theory), Engineering, Overhead (engineering), Civil engineering, Structural engineering, Forensic engineering, Electrical engineering