Analysis of Water Injection Capacity Reduction in Low Permeability Reservoirs and Measures for Solving It
Liguo Yin
Abstract
Liguo Yin
Abstract
Because permeability is low and pore throat is narrow in low permeability reservoirs,reinjected sewage quality can not meet the requirement of low permeability reservoir injection,which caused insufficient injection in water wells.The major causes of formation damage induced by sewage are determined by studying and the indexes for water injection in the block are established.By using various precision water quality treating devices and matched techniques for sewage treatment the quality of water can be improved and efficiency of low permeability reservoir production can be raised.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Because permeability is low and pore throat is narrow in low permeability reservoirs,reinjected sewage quality can not meet the requirement of low permeability reservoir injection,which caused insufficient injection in water wells.The major causes of formation damage induced by sewage are determined by studying and the indexes for water injection in the block are established.By using various precision water quality treating devices and matched techniques for sewage treatment the quality of water can be improved and efficiency of low permeability reservoir production can be raised.
Key concepts: Permeability (electromagnetism), Petroleum engineering, Water injection (oil production), Sewage, Injection well, Environmental science, Water quality, Water cut