2003•Journal of Hydraulic EngineeringRequires access

Formation conditions and initial site of tidal bore in the north branch of Yangtze River estuary

Yongsheng Liu

Open publisher page 6 citations

Abstract

The occurrence of tidal bore at the Qinglong Harbor,located at north branch of Yangtze River estuary is explored by hydraulic jump theory based on observed data.The tidal current velocity higher than the propagation velocity of tidal wave is the main cause of the formation of tidal bore and the converging river channel and submerged sand bars are the necessary conditions.The tidal influx volume larger than 1.5×10 8 m 3 at the Qinglong Harbor or the volume larger than 18×10 8m 3 at the river mouth are the sufficient conditions for bore forming.Furthermore,the formulas for calculating the tidal influx volume and tide range,which are varying along the river,are established.Under the condition of influx volume reaches 20×10 8m 3,the tidal bore will occur when the tidal wave propagates upward and reaches the Lingdian Harbor which is 50km upstream from the river mouth.It is concluded that the Lingdian Harbor is the inital site of the tidal bore.

About this research paper

What this paper is about

The occurrence of tidal bore at the Qinglong Harbor,located at north branch of Yangtze River estuary is explored by hydraulic jump theory based on observed data.The tidal current velocity higher than the propagation velocity of tidal wave is the main cause of the formation of tidal bore and the converging river channel and submerged sand bars are the necessary conditions.The tidal influx volume larger than 1.5×10 8 m 3 at the Qinglong Harbor or the volume larger than 18×10 8m 3 at the river mouth are the sufficient conditions for bore forming.Furthermore,the formulas for calculating the tidal influx volume and tide range,which are varying along the river,are established.Under the condition of influx volume reaches 20×10 8m 3,the tidal bore will occur when the tidal wave propagates upward and reaches the Lingdian Harbor which is 50km upstream from the river mouth.It is concluded that the Lingdian Harbor is the inital site of the tidal bore.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The occurrence of tidal bore at the Qinglong Harbor,located at north branch of Yangtze River estuary is explored by hydraulic jump theory based on observed data.The tidal current velocity higher than the propagation velocity of tidal wave is the main cause of the formation of tidal bore and the converging river channel and submerged sand bars are the necessary conditions.The tidal influx volume larger than 1.5×10 8 m 3 at the Qinglong Harbor or the volume larger than 18×10 8m 3 at the river mouth are the sufficient conditions for bore forming.Furthermore,the formulas for calculating the tidal influx volume and tide range,which are varying along the river,are established.Under the condition of influx volume reaches 20×10 8m 3,the tidal bore will occur when the tidal wave propagates upward and reaches the Lingdian Harbor which is 50km upstream from the river mouth.It is concluded that the Lingdian Harbor is the inital site of the tidal bore.

Key concepts: Tidal irrigation, Estuary, River mouth, Geology, Tidal range, Hydrology (agriculture), Current (fluid), Channel (broadcasting)

Related papers

Back to paper searchBrowse research topicsOriginal source
Formation conditions and initial site of tidal bore in the north branch of Yangtze River estuary — Research Paper | ScholarLens