2008Chinese Journal of Underground Space and EngineeringRequires access

Discussion on Geo-environment Engineering Problem and Countermeasures of Subway Line 1 in Chongqing

Ying-xiang Wu

Open publisher page 0 citations

Abstract

Because of the particularity of Chongqing city,such as congestion of large buildings,pipelines in serried ranks,the limited and changeless grounds and foundations,series of geotechnical environmental engineering problems come into being along with the 'Subway Line 1 Project',and these problems seriously influence the normal function of urban engineering constructions and security of structures.According to the characteristic of 'Subway Line 1 Project',and based on features of geological conditions in Chongqing,the potential Geo-environmental problems in the Line 1 Subway Project construction were analyzed,and some effective and pertinent measures,techniques,approaches or suggestions to prevent these kinds of trouble were put forward.Finally some key details that should be concerned were emphasized.It could offer some valuable reference for the 'Subway Line 1 Project'.

About this research paper

What this paper is about

Because of the particularity of Chongqing city,such as congestion of large buildings,pipelines in serried ranks,the limited and changeless grounds and foundations,series of geotechnical environmental engineering problems come into being along with the 'Subway Line 1 Project',and these problems seriously influence the normal function of urban engineering constructions and security of structures.According to the characteristic of 'Subway Line 1 Project',and based on features of geological conditions in Chongqing,the potential Geo-environmental problems in the Line 1 Subway Project construction were analyzed,and some effective and pertinent measures,techniques,approaches or suggestions to prevent these kinds of trouble were put forward.Finally some key details that should be concerned were emphasized.It could offer some valuable reference for the 'Subway Line 1 Project'.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Because of the particularity of Chongqing city,such as congestion of large buildings,pipelines in serried ranks,the limited and changeless grounds and foundations,series of geotechnical environmental engineering problems come into being along with the 'Subway Line 1 Project',and these problems seriously influence the normal function of urban engineering constructions and security of structures.According to the characteristic of 'Subway Line 1 Project',and based on features of geological conditions in Chongqing,the potential Geo-environmental problems in the Line 1 Subway Project construction were analyzed,and some effective and pertinent measures,techniques,approaches or suggestions to prevent these kinds of trouble were put forward.Finally some key details that should be concerned were emphasized.It could offer some valuable reference for the 'Subway Line 1 Project'.

Key concepts: Civil engineering, Construction engineering, Line (geometry), Function (biology), Engineering, Pipeline transport, Key (lock), Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on Geo-environment Engineering Problem and Countermeasures of Subway Line 1 in Chongqing — Research Paper | ScholarLens