On construction technique points for bored piles at bridges
Boyuan Wang
Abstract
Boyuan Wang
Abstract
Combining Nanshanxia Bridge project between No.S07 contraft section and the main line bridge along Dongsha-Xinlian expressway in Guangzhou,the paper introduces the construction points for the bridge bored piles on expressways,and concludes that the bored pile is the construction method with strong adaptability,moderate cost and the convenient construction,so it can be extensively applied in the bridge foundation construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combining Nanshanxia Bridge project between No.S07 contraft section and the main line bridge along Dongsha-Xinlian expressway in Guangzhou,the paper introduces the construction points for the bridge bored piles on expressways,and concludes that the bored pile is the construction method with strong adaptability,moderate cost and the convenient construction,so it can be extensively applied in the bridge foundation construction.
Key concepts: Bridge (graph theory), Pile, Foundation (evidence), Section (typography), Adaptability, Civil engineering, Engineering, Construction engineering