Study and practice on construction monitoring for prestressed concrete continuous beam bridge based on cantilever pouring

Haigen Cheng

Open publisher page 0 citations

Abstract

Construction of long span continuous beam bridge with cantilever pouring are more involved in much uncertain factor.To supervision of the construction process is an effective measure to ensure a smooth closure of such a bridge.Practice with specific projects,elaborated the strategy,method and process of construction monitoring for long span continuous beam bridge.Specified many details about temperature corrected,stress calculated and elevation determined for the construction segment,which will provide technical support to the same types of projects for the future.

About this research paper

What this paper is about

Construction of long span continuous beam bridge with cantilever pouring are more involved in much uncertain factor.To supervision of the construction process is an effective measure to ensure a smooth closure of such a bridge.Practice with specific projects,elaborated the strategy,method and process of construction monitoring for long span continuous beam bridge.Specified many details about temperature corrected,stress calculated and elevation determined for the construction segment,which will provide technical support to the same types of projects for the future.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction of long span continuous beam bridge with cantilever pouring are more involved in much uncertain factor.To supervision of the construction process is an effective measure to ensure a smooth closure of such a bridge.Practice with specific projects,elaborated the strategy,method and process of construction monitoring for long span continuous beam bridge.Specified many details about temperature corrected,stress calculated and elevation determined for the construction segment,which will provide technical support to the same types of projects for the future.

Key concepts: Bridge (graph theory), Cantilever, Prestressed concrete, Closure (psychology), Span (engineering), Structural engineering, Engineering, Process (computing)