2001Unpublished venueRequires access

Simulation test study on the construction of Danhe stone arch bridge

Xiang Zhong

Open publisher page 0 citations

Abstract

After simulation test study on the construction of Danhe bridge, it is testified for long span stone arch bridge that the common effect between the arch centre and the arch ring formed in advance is obvious and the stress of arch ring is related to the process of construction.

About this research paper

What this paper is about

After simulation test study on the construction of Danhe bridge, it is testified for long span stone arch bridge that the common effect between the arch centre and the arch ring formed in advance is obvious and the stress of arch ring is related to the process of construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After simulation test study on the construction of Danhe bridge, it is testified for long span stone arch bridge that the common effect between the arch centre and the arch ring formed in advance is obvious and the stress of arch ring is related to the process of construction.

Key concepts: Arch, Arch bridge, Bridge (graph theory), Structural engineering, Engineering, Forensic engineering, Span (engineering), Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Simulation test study on the construction of Danhe stone arch bridge — Research Paper | ScholarLens