2011Chinese Journal of Geotechnical EngineeringRequires access

Construction permit mechanism of karst tunnels based on dynamic assessment and management of risk

Shaoshuai Shi

Open publisher page 16 citations

Abstract

Jigongling Tunnel of Fanba Expressway passes through strong karst aquifer of Cambrian Shilongdong Fm,and water table is about 150~200 m above the tunnel floor.Large-scale water inrush and mud irruption are easy to happen.In order to control construction hazards,the karst development characteristics of the tunnel site are studied.The risk surroundings,factors and dynamic management for water inrush and mud irruption of the karst tunnel are analyzed.Preliminary,secondary and dynamic risk assessment models based on the comprehensive weights and the expert scoring method are established.A new management mechanism of construction risk,which is a kind of construction permit mechanism based on risk assessment of water or mud inrush,is developed and successfully carried out for the first time.This mechanism not only can be used for the risk management of karst tunnels,but also for other kinds of engineering constructions.It is successfully applied in the karst risk management of Jigongling Tunnel on the line of Fanba Expressway,and it is being employed to manage the construction risk of karst,and the large deformation of soft rock and collapse in Yichang-Badong Expressway.

About this research paper

What this paper is about

Jigongling Tunnel of Fanba Expressway passes through strong karst aquifer of Cambrian Shilongdong Fm,and water table is about 150~200 m above the tunnel floor.Large-scale water inrush and mud irruption are easy to happen.In order to control construction hazards,the karst development characteristics of the tunnel site are studied.The risk surroundings,factors and dynamic management for water inrush and mud irruption of the karst tunnel are analyzed.Preliminary,secondary and dynamic risk assessment models based on the comprehensive weights and the expert scoring method are established.A new management mechanism of construction risk,which is a kind of construction permit mechanism based on risk assessment of water or mud inrush,is developed and successfully carried out for the first time.This mechanism not only can be used for the risk management of karst tunnels,but also for other kinds of engineering constructions.It is successfully applied in the karst risk management of Jigongling Tunnel on the line of Fanba Expressway,and it is being employed to manage the construction risk of karst,and the large deformation of soft rock and collapse in Yichang-Badong Expressway.

Why it matters

OpenAlex reports 16 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Jigongling Tunnel of Fanba Expressway passes through strong karst aquifer of Cambrian Shilongdong Fm,and water table is about 150~200 m above the tunnel floor.Large-scale water inrush and mud irruption are easy to happen.In order to control construction hazards,the karst development characteristics of the tunnel site are studied.The risk surroundings,factors and dynamic management for water inrush and mud irruption of the karst tunnel are analyzed.Preliminary,secondary and dynamic risk assessment models based on the comprehensive weights and the expert scoring method are established.A new management mechanism of construction risk,which is a kind of construction permit mechanism based on risk assessment of water or mud inrush,is developed and successfully carried out for the first time.This mechanism not only can be used for the risk management of karst tunnels,but also for other kinds of engineering constructions.It is successfully applied in the karst risk management of Jigongling Tunnel on the line of Fanba Expressway,and it is being employed to manage the construction risk of karst,and the large deformation of soft rock and collapse in Yichang-Badong Expressway.

Key concepts: Karst, Inrush current, Geotechnical engineering, Tunnel construction, Geology, Mining engineering, Risk assessment, Mechanism (biology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction permit mechanism of karst tunnels based on dynamic assessment and management of risk — Research Paper | ScholarLens