2010Shanxi ArchitectureRequires access

Discussion on treating the high embankment by dynamic compaction

Yang Jian-bi

Open publisher page 0 citations

Abstract

Combining with the high embankment construction of embankment bridge engineering the third contract segment on Shanxi Xinzhou to Baode.It introduces the application of the dynamic compaction on the high embankment treatment.Summarizing the dynamic compaction construction technology and the attention points for construction to perfect the dynamic compaction construction.

About this research paper

What this paper is about

Combining with the high embankment construction of embankment bridge engineering the third contract segment on Shanxi Xinzhou to Baode.It introduces the application of the dynamic compaction on the high embankment treatment.Summarizing the dynamic compaction construction technology and the attention points for construction to perfect the dynamic compaction construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combining with the high embankment construction of embankment bridge engineering the third contract segment on Shanxi Xinzhou to Baode.It introduces the application of the dynamic compaction on the high embankment treatment.Summarizing the dynamic compaction construction technology and the attention points for construction to perfect the dynamic compaction construction.

Key concepts: Levee, Dynamic compaction, Compaction, Bridge (graph theory), Geotechnical engineering, Geology, Engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on treating the high embankment by dynamic compaction — Research Paper | ScholarLens