2009•Chinese Journal of Underground Space and EngineeringRequires access

Comparison Research on the Effect of Shield Tunnel Traversing Adjacently under the Existing Pile Foundations

Dongmei Luo

Open publisher page 2 citations

Abstract

Shield tunnel that traverses through under existing pile foundations in a close distance will cause some negative effect.In this article,engineering analysis method and numerical finite element method were used to study the effect caused by shield tunnel that goes through under an existing pile foundation.The lateral displacement and stress distribution of the pile bodies were calculated,and the results from two kinds of methods were in good agreement,which proved that the present methods are reliable.The results are helpful to estimate the safety of the pile foundations.

About this research paper

What this paper is about

Shield tunnel that traverses through under existing pile foundations in a close distance will cause some negative effect.In this article,engineering analysis method and numerical finite element method were used to study the effect caused by shield tunnel that goes through under an existing pile foundation.The lateral displacement and stress distribution of the pile bodies were calculated,and the results from two kinds of methods were in good agreement,which proved that the present methods are reliable.The results are helpful to estimate the safety of the pile foundations.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Shield tunnel that traverses through under existing pile foundations in a close distance will cause some negative effect.In this article,engineering analysis method and numerical finite element method were used to study the effect caused by shield tunnel that goes through under an existing pile foundation.The lateral displacement and stress distribution of the pile bodies were calculated,and the results from two kinds of methods were in good agreement,which proved that the present methods are reliable.The results are helpful to estimate the safety of the pile foundations.

Key concepts: Pile, Shield, Traverse, Foundation (evidence), Displacement (psychology), Geotechnical engineering, Structural engineering, Finite element method

Related papers

Back to paper searchBrowse research topicsOriginal source
Comparison Research on the Effect of Shield Tunnel Traversing Adjacently under the Existing Pile Foundations — Research Paper | ScholarLens