Demolition of a Multi-medium Chimney by Directional Blasting
Jianhua Xu
Abstract
Jianhua Xu
Abstract
In accordance with the special characteristics of a multi-medium chinemy with reinforced concrete base of 3 meters high and main body of 40 meters high brick construction. The expected results of the demolition blasting were reached by elaborately designed program and implementation, including the selecting program in advance and analysing the blasting parameters, blasting network. The pretreatment and safety protection measures and the blasting results are described.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In accordance with the special characteristics of a multi-medium chinemy with reinforced concrete base of 3 meters high and main body of 40 meters high brick construction. The expected results of the demolition blasting were reached by elaborately designed program and implementation, including the selecting program in advance and analysing the blasting parameters, blasting network. The pretreatment and safety protection measures and the blasting results are described.
Key concepts: Demolition, Rock blasting, Brick, Chimney (locomotive), Engineering, Environmental science, Civil engineering, Forensic engineering