Experimental study on sublevel caving method without floor pillar in Dongdashan mine
Mo Zhi
Abstract
Mo Zhi
Abstract
Through plane ore drawing experiment and economic analysis, the structural parameters of sublevel caving method without floor pillar in Dongdashan mine were improved, the commercial test was carried out and the orientation of optimizing indexes of mining method was put forward.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through plane ore drawing experiment and economic analysis, the structural parameters of sublevel caving method without floor pillar in Dongdashan mine were improved, the commercial test was carried out and the orientation of optimizing indexes of mining method was put forward.
Key concepts: Pillar, Mining engineering, Geotechnical engineering, Geology, Engineering, Structural engineering