Design and implementation of TCU based on GSM-R
WU Jing-pu
Abstract
WU Jing-pu
Abstract
The 1+1+Controlled train tail device is used in Daqin line. This device is based on GSM-R Network communication Platform for delivery of instruction. It plays an important role in monitoring of CRH safty Management Systems. The Set TCU, which provides real-time, high-speed, reliable data-tronsmission between the main unit and the controlling box is designed and implemented in this paper.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The 1+1+Controlled train tail device is used in Daqin line. This device is based on GSM-R Network communication Platform for delivery of instruction. It plays an important role in monitoring of CRH safty Management Systems. The Set TCU, which provides real-time, high-speed, reliable data-tronsmission between the main unit and the controlling box is designed and implemented in this paper.
Key concepts: GSM, Service data point, Computer science, Embedded system, Set (abstract data type), Real-time computing, Engineering, Computer network